8:00 A.M. Kitchen trench was outlined with lime.
Sod removal is begun.
Digging the first two fire pits.
Circa 4:30 PM: One third of kitchen completed;
trench with three fire places. Roughly 3 hours
per fireplace were needed to complete a single position.
Fireplace on left has a sheet-iron kettle
sitting on two pieces of sod to allow fire draught.
Preparing food on an earthen kitchen.
Kitchen fire box at night .